Drawing initiate lines

An initiate dependency indicates that when a job completes successfully, the job or jobs that are initiated are submitted for execution immediately. This is indicated in the EnterpriseSCHEDULE layout as a line with an arrow between jobs. In order to graphically create an initiate between jobs:

  1. Click on the Job Connection button or select Connections from the Draw menu.
  2. Click on the job that will initiate the other job(s).
  3. Hold the mouse button down and drag to the the job that will be initiated.
  4. Release the mouse button. A line with an arrow pointing to the job to be initiated will appear.