Resource requirement and instruction
The Add Resource requirement window contains a comment field and a variety of instructions to choose from in a drop down list. The default is not set. Selecting other instructions yield the following resource capabilities:

- Check for a file then wait if not found

In this case the job is held until the designated file is found. - Check for a condition then wait if it is true

For this case, the job commands will not be executed until the condition is satisfied. - Check for a condition and then set a variable value

The variable is set to the designated value is the condition is met. - Check for a condition and then suppress this run

The job run is suppressed if the condition is satisfied.- Set a variable value

The value of the variable is set to a designated value. - Include resource requirements from another job

In this case, resource requirements from a designated job can be brought into the currently selected job. - Set a variable value

The value of the variable is set to a designated value. - Enter a free form instruction

Any instruction may be entered in this field.